Industry

Servers and Storage for System Integrators

Integrators win projects on a bill of materials and lose margin when the hardware does not match it. We source servers, storage and parts through Dubai against your project BOM, confirm every line with suppliers and ship with the records your customer's acceptance tests will ask for.

Several generic rack servers being prepared side by side on a staging bench with bundled cables
Project BOM
Quoted line by line
Tender-ready
Specs and documents per line
Mixed orders
Servers, storage, parts
Price Beat Promise
On verified written quotes

How we work with integrators

An integrator's hardware order is usually one part of a bigger delivery: a virtualisation platform for a bank, a records system for a ministry, a backup site for a manufacturer. The BOM was agreed with the end customer, and substitutions need approval. We quote against that BOM exactly, flag any line that cannot be matched and propose equivalents only for your approval.

Acceptance testing depends on records. Serial lists, firmware versions, test logs and drive sanitization records make it easy to show the customer that the delivered hardware matches the contract. We collect them as standard and send them before the shipment lands.

Price pressure is constant in tenders. If you already hold a lower written quote from another supplier for the same items and terms, our Price Beat Promise applies under the conditions in our terms.

What integrators ask us to confirm in writing

Points we confirm in the quote for every project order.

01

BOM fidelity

Every line matched to the project specification, with substitutes only on your written approval.

02

Consistent batches

Same parts and firmware across units, so deployment scripts and images work everywhere.

03

Records for acceptance

Serial lists, test logs and sanitization records ready for the customer's acceptance tests.

04

Warranty clarity

The warranty basis per line stated plainly, so you can price your own support commitment.

Project order checklist

What to send with a project BOM.

  • The BOM or tender specification, line by line
  • Which lines allow equivalents and which must be exact
  • Condition required per line
  • Delivery site, delivery terms and any staging needs
  • Documents the end customer requires
  • Warranty basis needed per line
  • Any competing written quote for the Price Beat Promise

How to write a rack server bill of materials

Configure-to-order builds

From enquiry to shipment

The same four checkpoints keep the sample, contract and commercial lot aligned.

  1. BOM checked

    We review the BOM for conflicts and lines that are hard to source, before suppliers are briefed.

  2. Quote issued

    One written quote covers every line, with condition, warranty basis and lead time per line.

  3. Built and recorded

    Servers are built or prepared to the BOM, tested and recorded per serial.

  4. Delivered with records

    Records are emailed in advance and travel with the shipment for acceptance.

Questions buyers ask

Can you ship directly to our customer's site?

Yes, under the delivery terms agreed in the quote. The documents can be prepared in your name or your customer's, as the order requires.

Do you sell to end users as well as integrators?

We quote business buyers of all kinds. Integrator and reseller orders are handled with the same care and discretion.

How does the Price Beat Promise apply to tenders?

Share the competing written quote before you order. If it is current, from a supplier able to deliver, and covers the same items, grade, quantity and delivery terms, we beat it in our written quote.

Continue your research

Get a quote built around your actual requirement

Send the models or specifications, quantities, condition, destination and timeline. Our sourcing desk checks availability with suppliers and replies with written options.

Start Your Request